Concrete and Sitework Along US 82 in Bowie County, Texas

Driveways, aprons, walks and storm drain connections for roadside sites along the US 82 widening through Hooks, New Boston and DeKalb, Texas.

A five-lane section changes what a roadside lot is worth, and it changes what the driveway into it costs. US 82 runs west from Texarkana through Hooks, New Boston and DeKalb in Bowie County, and TxDOT says the corridor is part of the Texas Trunk System, the National Highway System and the Texas Freight Corridor. The Atlanta District is preparing plans to widen the existing two-lane highway to a four-lane divided highway in separate projects, so the road beside your property will look different in a few years. We build the concrete and sitework that connects private land to that road.

The nearest big contract is documented. KSLA reported in August 2024 that a Paris contractor won the US 82 widening contract from I-30 to US 259 at a bid of $114,513,431, a five-lane section with a continuous center left-turn lane, with work scheduled to begin in November 2024 and finish in 2028. The station said about 10,000 cars use that section daily. TxDOT's project page for the stretch from 0.1 mile west of US 259 to 0.4 mile south of I-30 lists a $75.4 million estimate, which is earlier than the bid.

That project page also lists a new storm drain system with inlets, reconstruction of the ramps on both sides of US 259 and relocation of the existing trail about 25 feet south. We mention these details because they describe what a rebuilt road does to its neighbors: new inlets pick up runoff, ramps change entrances and trails move. A site plan that ignores them risks drawing a drive where the state plans an inlet.

Driveways, aprons and the first 50 feet of a roadside lot

The first 50 feet inside a roadside lot are where most mistakes happen. The driveway meets the highway at a grade the state controls, the apron has to carry turning trucks, and the lot has to drain back into the road system without ponding at the curb. We pour concrete paving for these entrances with doweled joints, thickened edges and a slope that sheds water to the inlets shown on the plans.

Walks and trail connections are the other half. When a trail moves, a business that expected foot traffic from the old alignment may want a spur. We form and finish sidewalks and flatwork to connect the lot to the trail or the new shoulder, with accessible slopes and detectable warnings where required.

Small commercial buildings along the route, such as a convenience store, a feed supplier or a trucking shop, tend to share a pattern: a modest slab, a fuel or equipment pad, a wide apron for trucks and trailers, and a lot that has to stay open while the work goes on. We phase these jobs so one drive stays usable, pour the apron in halves and keep the sidewalk and ramps clear for customers until the last day.

Storm drains, utilities and relocations

When a road widens, storm drains and utilities move. We install storm drain installation for private lots that tie into the new system, setting pipe, inlets and headwalls to the plan and checking inverts before backfill. If a water line or power pole is in the way of a new drive, utility relocation is coordinated with the utility owner so the pour does not wait on a line that has not moved.

Coordination is the real work. A private drain connecting to a state inlet needs a permit and an inspection, and a relocated line needs the owner's crew. We keep a contact list for each, schedule the sequence and make sure the concrete goes in only when the grade is final.

Planning the lot before the road crew arrives

We ask owners to call early, ideally when the road design is public. Looking at the state's plan sheets, we mark the future edge of the pavement, the inlet locations and the right of way, and then fit the driveway and building to those lines. It is much cheaper to move a drive on paper than to rebuild it after the road crew has set the curb.

When a lot is already built, we look at what the widening will change. A driveway that used to enter a two-lane road may now meet a median or turn lane, and a left turn may no longer be possible. We help owners see that before they sign a lease or a contract and propose options for an entrance that still works.

Hauling and pouring beside a work zone

Work zones slow traffic and narrow lanes. Delivery drivers check the lane closure schedule, enter and leave through the safest driveway and avoid the shoulder where the plan prohibits it. Concrete deliveries use a window of a few hours between mixing and discharge, so the dispatcher in the plant and our foreman on site stay in touch by phone and radio.

Distances matter, too. US 82 runs west of Texarkana through Hooks, New Boston and DeKalb, and the batch plant may be a good drive from the job. We adjust load sizes and spacing so that the finishers are never waiting and the last load does not arrive after the sun has made the surface set. On long placements, we add retarder to the mix, and we shade and cure the slab quickly.

Who calls us about this corridor

Owners along the highway include local businesses, commercial developers and public agencies. Municipal and public works departments call about sidewalks, culverts and drainage that connect to the state road. Developers ask about entrances and pads.

The corridor also leads to larger industrial parks. Our page on TexAmericas Center covers the industrial park west of Texarkana, and the freight corridor designation is part of why it matters. Another route, described on the I-369 and US 59 corridor page, runs south and west from the loop, and the two highways together carry much of the area's freight.

Fit the lot to the new road

Send the plan sheets and your site plan. We will mark the future edge of pavement, inlets and right of way, then price the entrance, the apron and the drainage tie-ins.

Common Questions

When will the US 82 widening be finished?

The KSLA report said work was scheduled to begin in November 2024 and finish in 2028. Schedules change, so check TxDOT's project notices before planning deliveries or an opening date.

Will my driveway change when the road is widened?

Possibly. A five-lane section with a center left-turn lane can change turning movements and curb lines. Get the plan sheets and ask the Atlanta District how your access will be affected.

Do I need a permit to connect a private drain to the state system?

Yes. Connections to state drainage need approval and inspection. We prepare the details and coordinate the connection.

Why does the cost estimate differ from the contract bid?

The project page we cite shows a $75.4 million estimate that predates the $114,513,431 bid, and the two cover different limits. We cite both as published and do not reconcile them.

What should I ask before buying a lot on US 82?

Ask for the TxDOT plan sheets, the driveway permit history, the mapped floodplain status and a recent soil report. Then ask where the future inlets and median openings fall. A lot that looks perfect on today's two-lane road may have a very different entrance on the five-lane plan, and we can review the drawings with you before closing.

Can you pour during road construction?

Yes, with a plan for lane closures, truck routes and the stage of the road. We confirm access the day before every pour.

Related

Ready to talk about your project?

Request a Project Review
ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review903-568-7544
Call us903-568-7544