Concrete and Sitework Along I-369 and US 59 in Bowie and Cass Counties, Texas

Truck courts, dock aprons, soil treatment and land development for freight sites along I-369 and US 59 south of Texarkana, Texas into Cass County.

Anyone shopping for warehouse land south and west of Texarkana is really shopping for an interstate that is not finished yet. The first piece is in place: TxDOT's Highway Designation File states that a 3.5 mile segment of US 59 in Bowie County, from I-30 to State Loop 151 in Texarkana, was designated I-369 in 2013. Beyond that, the road is still US 59, and the department's own study page says the highway there does not currently meet interstate standards. Our job on a parcel along this route is to build the truck courts, slabs and utilities for the traffic that is here today and the freight that interstate status may attract later.

That study covered about 16 miles from State Loop 151 in Texarkana south to FM 2327 north of Queen City near Lanark in Cass County, for a route to be built to interstate standards as I-369. It ran from summer 2017 to September 2018, with open houses on July 24 and 26, 2018. A study is not a construction schedule, and we do not treat it as one. It does tell an owner where the state expects the road to go, and it is a reason to leave room on a site for a future frontage road, a wider right of way or a changed driveway.

Further south, Wikipedia reports that US 59 runs through Queen City, about 22 miles from Texarkana, bypasses Atlanta to the west and passes through the east side of Linden. For a contractor, that is a string of small towns, each with industrial and commercial pockets on state-highway frontage, and each with its own soil, utilities and access.

Freight buildings that follow the highway

Distribution and fulfillment users pick sites by drive time to the interstate, and a future interstate corridor changes that math. We prepare pads and pavements for logistics and fulfillment centers and for general warehouses, with truck courts sized for the trailer count the tenant expects and for the turn radius of a 53-foot trailer.

The common thread is the dock apron. Trailers back into the same spot all day, so we thicken the pavement at the dock, dowel the joints and slope the surface away from the building so ice and rain do not collect at the doors. We bring the same discipline to the car parking, which gets a lighter section and cleaner joint layout.

Speculative buildings add a question of divisibility. A shell that may be cut into several tenant bays needs dock doors, sleeves and slab thickness that suit the smallest and the largest user, so we talk with the developer about the likely tenant mix before we set joint patterns. Changing a floor after it is poured is a saw, a jackhammer and a long delay, and a little planning up front costs very little by comparison.

From raw acreage to a pad ready for steel

Many of the parcels along US 59 are timber, pasture or cutover land. The first job is clearing and stripping, then mass grading to the engineer's pad elevation, and then utilities and drainage. The land development infrastructure trade crews handle roads, water, sewer and storm lines so a developer can deal with one contractor from the stripping to the slab.

Because the tracts are rural, utilities may be farther away than they appear on a map. We price extensions from the nearest main, tie-ins at the highway and any boring under the road, and we flag where a well, a septic system or a private fire pump might be the only real option. Clear scope lines in the bid avoid arguments later.

Soils decide the pavement

Cass County's elevation ranges from 167 to 627 feet and the Texas Almanac lists 49.2 inches of rainfall in 2019, so the ground along the route changes quickly from ridge to bottomland. On wet or clayey ground we recommend lime and cement soil treatment to stiffen the subgrade before paving. It costs less than undercutting and replacing clay, and it gives a more uniform base for dock aprons.

We do not choose treatment by feel. A geotechnical engineer sets the lime content and depth from lab tests, and we mix, compact and cure to that specification with density tests. Where the soil is fine, we say so and skip the treatment.

Corridors that meet this one

The corridor ties into two other roads we describe separately. Our US 82 corridor page covers the highway that TxDOT says is part of the Texas Freight Corridor, and a TxDOT project there runs from 0.9 mile west of FM 989 to the I-369 west frontage road, tying the two corridors together. Our I-30 corridor page covers the interstate that meets this one at the northern end.

For owners, that means a site near the interchange can reach several routes. A developer building spec space will price access from every direction and choose the entrance that gives trucks the easiest turn. We help evaluate that choice with a pavement and drainage budget for each alternative.

Texarkana, Queen City, Atlanta and Linden

We work along the route from the Texarkana loop south into Cass County. The edge of the Texarkana market is the same blackland and red clay country described on our page about Bowie and Cass county site conditions, so we bring the same subgrade routines to each job.

Owners ask whether we can serve small-town sites as well as big projects. We can, and we scale mobilization to the job. A single dock slab for a local manufacturer is handled by a small crew, while a spec building on a hundred acres gets a larger spread. Logistics and warehouse developers who need both can have one team.

Walk the parcel with us

Send the parcel boundary and the target building. We will review soils, access and utilities, then give you a pad-ready budget with pavement options.

Common Questions

Is I-369 fully built to interstate standards?

No. TxDOT designated a 3.5 mile segment of US 59 from I-30 to State Loop 151 as I-369 in 2013, and a route study covered about 16 miles south to near Queen City. The study page says US 59 there does not currently meet interstate standards, so plan for the road as it is today.

Should I leave room for a future frontage road?

If your parcel fronts US 59, it is worth asking TxDOT about future right of way and access. We can lay out the pad and drainage so a frontage road or wider shoulders later would not strand the building.

How do I decide between concrete and asphalt for a truck court?

Concrete handles standing trailers, turning trucks and fuel better, but costs more up front. We price both for your tenant's traffic and show the life-cycle difference so you can choose.

What does lime treatment do on clay?

It lowers plasticity and raises strength, so the subgrade moves less with moisture. It needs proper mixing, compaction and curing time, which we schedule before pavement.

How early should a concrete contractor join a spec building project?

As early as the site plan. We can compare pavement sections, test the subgrade assumptions, shift dock locations to improve truck circulation and give the developer a firm number for the whole concrete and sitework package before the building is under contract with a tenant. Early input usually saves more than it costs.

Can you serve a site in Cass County?

Yes. Cass County is part of our market, and we plan haul distances and mobilization for each job.

Related

Ready to talk about your project?

Request a Project Review